Monthly Basis Maintenance of Transformer


Let us first discuss about the action to be taken on power transformer in monthly basis.
1. The oil level in oil cap under silica gel breather must be checked in a one-month interval. If it is found the transformer oil inside the cup comes below the specified level, oil to be top up as per specified level.
2. Breathing holes in silica gel breather should also be checked monthly and properly cleaned if required, for proper breathing action.
3. If the transformer has oil filled bushing the oil level of transformer oil inside the bushing must be vidually checked in the oil gage attached to those bushing. This action also to be done monthly basis.
If it is required, the oil to be filled in the bushing upto correct level. Oil filling to be done under shutdown condition.

Daily Basis Maintenance and Checking


There are three main things which to be checked on a power transformer on a daily basis:
1. Reading of MOG (Magnetic Oil Gauge) of main tank and conservator tank.
2. Color of silica gel in breather.
3. Leakage of oil from any point of a transformer.
In case of unsatisfactory oil level in the MOG, oil to be filled in transformer and also the transformer tank to be checked for oil leakage. If oil leakage is found take required action to plug the leakage. If silica gel becomes pinkish, it should be replaced.

Yearly Basis Transformer Maintenance Schedule


1. The auto, remote, manual function of cooling system that means, oil pumps, air fans, and other items engaged in cooling system of transformer, along with their control circuit to be checked in the interval of one year. In the case of trouble, investigate control circuit and physical condition of pumps and fans.
2. All the bushings of the transformer to be cleaned by soft cotton cloths yearly. During cleaning the bushing should be checked for cracking.
3. Oil condition of OLTC to be examined in every year. For that, oil sample to be taken from drain valve of divertor tank, and this collected oil sample to be tested for dielectric strength (BDV) and moisture content (PPM). If BDV is low and PPM for moisture is found high compared to recommended values, the oil inside the OLTC to be replaced or filtered.
4. Mechanical inspection of Buchholz relays to be carried out on yearly basis.
5. All marshalling boxes to be cleaned from inside at least once in a year. All illumination, space heaters, to be checked whether they are functioning properly or not. If not, required maintenance action to be taken. All the terminal connections of control and relay wiring to be checked an tighten at least once in a year.
6. All the relays, alarms and control switches along with their circuit, in R&C panel (Relay and Control Panel) and RTCC (Remote Tap Changer Control Panel) to be cleaned by appropriate cleaning agent.
7. The pockets for OTI, WTI (Oil Temperature Indicator & Winding Temperature Indicator) on the transformer top cover to be checked and if required oil to be replenished.
8. The proper function of Pressure Release Device and Buchholz relay must be checked annually. For that, trip contacts and alarm contacts of the said devices are shorted by a small piece of wire, and observe whether the concerned relays in remote panel are properly working or not.
9. Insulation resistance and polarization index of transformer must be checked with battery operated megger of 5 KV range.
10. Resistive value of earth connection and rizer must be measured annually with clamp on earth resistance meter.
11. DGA or Dissolve Gas Analysis of transformer Oil should be performed, annually for 132 KV transformer, once in 2 years for the transformer below 132 KV transformer and in 2 years interval for the transformer above 132 KV transformer.

The Action to be taken once in 2 years


1. The calibration of OTI and WTI must be carried once in two years.
2. Tan & delta; measurement of bushings of transformer also to be done once in two years.

Maintenance of Transformer on Half Yearly Basis


The transformer oil must be checked half yearly basis that means once in 6 months, for dielectric strength, water content, acidity, sludge content, flash point, DDA, IFT, resistivity for transformer oil.
In the case of a distribution transformer, as they are operating light load condition all the time of day remaining peak hours, so there are no maintenance required.
1. Thermo vision camera to be used for checking any hot spots in the capacitor stacks to ensure pro action of rectification.
2. The terminal connections PT junction box including earth connections to be checked for tightness once in a year. In addition to that, the PT junction box also to be cleaned properly once in a year.
3. The health of all gasket joint also to be visually checked and replaced if any damaged gasket found.


Note that in addition all yearly basis maintenance of potential transformer or capacitor voltage transformer must also be checked for tan δ once in 3 years. An increase in the value of tan δ indicates deterioration of insulation whereas both increases in tan δ and capacitance indicate the entry of moisture into the insulation.